By constructing an extension, a new common area has been created along the entire length of the back of the school (25m x 5m). The floors have been reinforced by clamping the beam layer. New ceilings have also been installed in the changing rooms, hallway, storage spaces, and restrooms. The latter has been completely redesigned to accommodate a new boiler room where the new heating system is installed.