Stiff and Trevlilon’s design revitalises a 97,000 sq ft (27,432 m²) building through an extensive refurbishment. A standout feature of the project is the new roof pavilion, framed with Cross-Laminated Timber (CLT), and clad in a distinctive scalloped brass. This roof extension is complemented by a raised and cranked curtain wall system with bespoke brass and bronze cladding, forming part of a steel framing system (SFS).
The design, which includes two additional floors, showcases an energy efficient approach, winning accolades such as BREEAM 'EXCELLENT', ATA Awards for Office, Future Projects, and Stakeholder Engagement in 2021. The primary structural system is made from CLT.